the passage of sound transit 2 in 2008 , sound transit 3 in 2016 enabled sound transit plan future extensions of link light rail system, scheduled open in stages between 2021 , 2040. northgate link extension scheduled open in 2021, extending service north northgate transit center, followed east link extension in 2023, creating new line bellevue , redmond. central link re-branded red line between northgate , angle lake, while blue line trains travel between northgate , redmond on east link, sharing tracks between northgate , international district/chinatown. red line extended south , north suburbs of federal way , lynnwood, respectively, in 2024. in 2030, branch of red line west seattle begin service, temporarily operating between alaska junction , sodo station. opening of extension ballard in 2035, traveling via new tunnel through downtown seattle, split central link between 2 lines: red line, operating lynnwood (and later everett) west seattle; , green line, operating ballard tacoma via rainier valley , sea-tac airport. 2 infill stations along current route of central link planned open in 2031 @ south graham street in rainier valley , boeing access road in northern tukwila.
Comments
Post a Comment